
The Windsor-Essex Parkway is an unprecedented highway project. Its scope, features and benefits to travellers and the community are one-of-a-kind.
The Windsor-Essex Parkway will reflect the high safety standards and practices that have consistently made Ontario’s roads among the safest in North America. This state-of-the-art Parkway will provide border-bound travellers with direct freeway access to a modern inspection plaza and a new international river crossing, cutting valuable travel time off of their trips. Local travellers will be able to enter and exit the route easily via the Parkway’s many on and off ramps. Service roads will improve access to schools, shops, neighbourhoods and natural areas.
Tunnelled roadways will provide community connections for the first time while restoring natural linkages. Pedestrians and cyclists will enjoy 20 km of new recreational trails and will be able to travel the length of the corridor without encountering a motor vehicle. Their use will be safe for the whole family. The community will benefit from more than 300 Acres of green space and various opportunities to determine their use – a local solution for the people of Windsor-Essex.
![]()
Check out real-time road conditions along the Windsor-Essex Parkway corridor by viewing the Ministry of Transportation COMPASS traffic cameras. Click on any camera image along Highway 401, Talbot Road/Highway 3 or Huron Church Road.
Date: Week of January 30, 2012
TRAFFIC NOTES:
- EC Row Expressway, eastbound left lane, will be closed between Ojibway Parkway until east of the Matchette Road overpass on Tuesday, February 7, 2012 from 12:00 a.m. until 5:00 a.m.
- Huron Church Road northbound right lane between Pulford Street and Grand Marais Road will be closed starting January 6 until April 2012.
- Outer Drive south of Highway 3 will be closed starting at 8:00 a.m., Monday, October 24. View the public notice English French
- A portion of North Talbot Road will be closed for up to nine months starting at 3 a.m. on Saturday, August 20. View the detour map. View the public notice English French
CONSTRUCTION ACTIVITIES:
AMICO INFRASTRUCTURES
- Construction activities for Howard Avenue Diversion
- Sanitary sewer works in Spring Garden Area
- Earthworks; topsoil removal, excavation and fill along construction corridor
- Wick drain works in the areas of Matchette, Chappus and Ojibway
- Water main works on Broadway, Bethlehem and Howard Ave at Highway 3
- Bridge abutment and centre median pier construction the North Talbot Road Bridge
- Construction works for new culvert at Grand Marais Drain
- Test piling operations
- Environmental construction monitoring
- Geotechnical data collection
February 8, 2012 - Public Information Open House #5 and Neighbourhood Meetings. View the public notice English French
January 24, 2012 - The new Spring Garden Road is now open to traffic. The previous alignment is permanently closed. View the map.
January 26-27 - Matchette Road will be closed at Broadway Boulevard, between Armanda Street and Sprucewood Avenue.
View the Public Notice
January 13, 2012 - Significant progress was made on Windsor border projects in 2011.
Read the news release and backgrounder
-
Loading Latest Tweet...

Community Newsletter
Read more about The Windsor-Essex Parkway and your community.
Winter 2012 English
Fall 2011 English French
Summer 2011 English French
Spring 2011 English French
Fall 2010 English French
The Complaints Management Protocol outlines how your comments, concerns and complaints will be addressed during construction.
Recipient of:
![]() 2010 IPAC Deloitte Public Sector Leadership Award — Bronze |
2009 Transportation Association of Canada — Environmental Achievement |
2010 Consulting Engineers of Ontario Award of Merit — Transportation |
